Projects
Latest Projects
NYK
Maersk Line
Maersk Tankers
GESCO
Summary: ARK Marine completed a full docking and BWTS retrofit for a container ship in China.Allaspects of the project were managed remotely. The result: zero delays, full compliance and a highly satisfied client.
Challenge:
Oversee dry docking and Ballast Water Treatment System (BWTS) installation for a 13-year-old, 1022 TEU container vessel in Shenzhen, China, remotely, while adhering to a stringent timeline, budget and class compliance.
Approach:
A local superintendent was appointed to coordinate activities across the shipyard, client’s Technical Manager and the vessel owners. The project priorities included:
Outcome:
The vessel was re-delivered ready for global operations within 20 days, on budget, adhering to all compliances. The smooth remote execution reaffirmed ARK Marine’s expertise in global retrofit projects.
Summary: ARK Marine led a remote dry dock of a mid-sized Chemical/Oil Tanker in Turkey, ensuring every process met strict regulatory and quality controls. The project was delivered with zero disruptions.
Challenge:
Supervise dry dock operations of a 36,993 DWT, 15-year-old tanker at Besiktas Shipyard, Turkey, remotely, without compromising on quality, cost or timelines.
Approach:
To enhance operational control, ARK Marine adopted a validated remote oversight framework. This allowed seamless monitoring of activities on the location in real time.
Summary: Ahead of a major acquisition, ARK Marine conducted comprehensive technical audits for an entire fleet: assessing risk, value and compliance. The insights derived, powered a confident transaction.
Challenge:
Support a client with pre-acquisition technical due diligence for their fleet, in order toenable transparent decision-making for a prospective buyer.
Approach:
A dedicated five-person team from ARK Marine carried out a comprehensive review over a two-month period to identify key areas for improvement.
Onsite physical inspection of vesselsRemote audit of office systems and documentationEfficient OPEX and CAPEX profiling Dry dock and maintenance history analysis
IMO 2020 and safety regulation assessments Client-focused insights for strategic decisions
Outcome:
The findings delivered a well-rounded technical view of the fleet, influencing a high-value acquisition.
ARK Marine's customised approach and expert evaluation were key to the client's confidence.
Summary: Faced with pandemic restrictions and national holidays, ARK Marine delivered a full-scale docking, EGCS and BWTS installation, and crane renewals: all remotely coordinated, without a glitch.
Challenge:
Execute a complex dry dockincluding BWTS, EGCS, and crane renewalsfor a 150,000 DWT Suezmax tanker at the COSCO Shipyard in China, under strict COVID-19 protocols and logistic constraints.
Approach:
Since inception, ARK Marine has invested in establishing fail-safe remote operations protocols. These measures ensured uninterrupted operational continuity, even during the restricted travel conditions of the COVID-19 lockdown.
· Remote project control and stakeholder engagement
Outcome:
In 42 days, all installations and repairs were executed with precision, within budget, and to the client’s satisfaction. Thus,demonstrating ARK Marine’s ability to manage high-stakes remote dockings.
Summary:ARK Marine’s well-established remoteprotocols were clearly demonstrated through this project.
This was the fourth project in the same quarter to be delivered punctually, cost-effectively, and meeting all compliance standards.
Challenge:
Manage the dry docking of MT Jag Padma, a 50,000 DWT LR1 tanker, at the ASRY Shipyard in Bahrain, remotely and efficiently.
Approach:
ARK Marine applied its well-established location-independent and high-performance SOP framework to deliver this project.
Summary: Steel repairs and crane modifications under harsh desert conditions?
ARK Marine managed it seamlessly—safely delivering the project amid pandemic challenges.
Challenge:
Supervise critical repairs, including steelwork and crane modifications, on a Suezmax tanker at ASRY Shipyard amid 45°C heat and COVID-19 restrictions.
Approach:
Custom-purposing our well-established remote execution protocols, ARK Marine achieved operational excellence and maintenance.
Outcome:
The client commended the timely completion of the project, which fulfilled all necessary technical standards.
This highlighted ARK Marine’s adaptability in managing challenging site conditions and strict regulatory requirements.
Summary: From survey planning to crane renewal, ARK Marine’s turnkey model brought end-to-end efficiency to this docking project.
The delivery was completed with zero deviation from scope, schedule, or objectives.
Challenge:
Full-scope docking for a Suezmax-class vessel in Zhoushan under a turnkey contract.
The project involved a special classification survey, BWMS integration, scrubber system retrofit, and replacement of 20-metric-ton deck cranes.
Approach:
ARK Marine maintained end-to-end oversight, covering engineering, compliance, and operational execution.
This approach ensured consistency, risk mitigation and on-schedule delivery.
Outcome:
The project was delivered on time, on budget, and in full regulatory alignment.
It highlighted ARK Marine’s ability to manage full-cycle dockings with accountability and technical rigour.
Summary: ARK Marine partnered with The Great Eastern Shipping Company to drive a remote docking operation.
The effort was defined by mutual trust, clear communication and agile problem-solving.
Challenge:
ARK Marine was tasked with a challenge to execute remote docking for a Suezmax tanker in collaboration with GE Shippingunder globally constrained circumstances.
Approach:
Grounded in a collaborative approach, ARK Marine delivered by synchronizing efforts across stakeholders and maintaining continuous engagement. This facilitated real-time issue resolution with the highest standards of quality and compliance.
Outcome:
The vessel was redelivered successfully, thanks to exemplary teamwork between ARK Marine, the GE Shipping team and the onboard crew. The project affirmed ARK Marine’s leadership in remote execution and stakeholder partnership.